Pre-functional checks
Start with a system that is ready to test.
Installation reviews, equipment checks, verification of access, instrumentation and readiness records before functional testing begins.
Commissioning services
A practical commissioning scope built around your design intent, project programme and building’s operational needs.
Start with a system that is ready to test.
Installation reviews, equipment checks, verification of access, instrumentation and readiness records before functional testing begins.
Prove the system against the design intent.
Witness operating sequences, test occupied and unoccupied modes, verify alarms and document how each system responds.
The right flow, where it matters.
Proportional air balancing, hydronic testing and balancing, differential pressure measurements and recorded final settings.
Connect control logic to real performance.
Point-to-point checks, sensor verification, setpoints, interlocks, trend reviews and integrated operating sequences.
Test beyond the handover season.
Return under different weather and load conditions to review heating, cooling and ventilation performance.
Understand what an existing building needs.
Review current operation, identify performance gaps and prioritise practical adjustments to existing systems.
Keep performance on track.
Use trends, operator feedback and measured results to refine schedules, setpoints and system response.
One clear path from scope to close-out.
Commissioning plans, coordinated test programmes, issue registers, witnessed testing and structured handover documentation.
One coordinated programme
Agree the scope early, record the evidence and keep outstanding issues visible through to close-out.
Clarify design intent, test requirements and the commissioning plan.
Review installation readiness and close out issues before testing.
Measure flows, verify controls and record functional performance.
Provide clear reports, final settings and operator information.
Review seasonal operation and tune performance after occupation.
Sectors
Requirements vary by building use, consent conditions and the needs of occupants and operators.
01
Office buildings, retail, mixed-use developments and occupied workplaces.
02
Ventilation verification coordinated with the facility’s design and operational requirements.
03
Schools, tertiary facilities and adaptable learning environments.
04
Warehouses, production spaces and process-support environments.
05
Hotels, accommodation and hospitality spaces with varied operating hours.
06
Multi-unit apartments and residential developments with shared plant and ventilation.
Related capabilities
Alongside commissioning, discuss HVAC design, ductwork, BMS software, integration and electrical control wiring requirements.
BMS & electrical capabilitiesConfirm design responsibility, required trade registrations and life-safety testing scope in your project quote.
Let's get it working properly