Sample / template
Sample commissioning report
A structured example for scope, test records, outstanding issues and handover evidence.
Download PDF PDF · 52 KB · 2 pagesUseful on site. Clear at handover.
Download sample documents, use practical air and water calculators, and explore commissioning guidance.
Downloads
These PDFs are samples and templates. Adapt them to the actual project, systems and agreed acceptance criteria.
Sample / template
A structured example for scope, test records, outstanding issues and handover evidence.
Download PDF PDF · 52 KB · 2 pagesSample / template
A practical template to review system installation, controls and readiness before testing.
Download PDF PDF · 52 KB · 2 pagesSample / template
A company capability document with clearly marked fields for verified people, credentials and projects.
Download PDF PDF · 52 KB · 2 pagesNo sample document is an actual commissioning record, certificate or claim of qualification. Replace all bracketed fields and obtain the required project approvals before issue.
Engineering hub
Purpose-built tools for air and water systems, with visible units, assumptions and source references.
Choose an exact supported valve version and setting, or enter a verified coefficient from your own reference. Manufacturer data and measurement-port definitions matter.
Calculate valve flowDuct area and conditional capacity, run pressure losses, fan pressures and speed changes, pump head, heat duty, air changes and unit conversions.
Explore the calculatorsA field reference for pressure terms, measurement methods, balancing, controls verification and commissioning records, with NZ guidance links.
Open the handbookUse the correct system model, instrument locations and project acceptance criteria. Velocity-based duct capacity is conditional; fan duty comes from the exact manufacturer's curve. Published coefficients are not a claim of equivalence to every HyTools calculation or valve generation.
Field notes
A practical look at design reviews, test readiness and the value of resolving issues early.
Read insightHow clear test records can support a project’s G4 ventilation and consent documentation.
Read insightStart building tuning with operating hours, setpoints and the trends already in your BMS.
Read insightLet's get it working properly