Commissioning
& performance testing
From pre-functional checks to witnessed functional tests, establish that your systems operate as the design intends.
Verify your systemsHVAC commissioning · New Zealand
Better-performing buildings start with systems that work as intended. We test, balance and verify your HVAC — from design review to the final handover.
Auckland based. Supporting projects across Aotearoa.

What we do
Practical, coordinated support for engineers, contractors, building owners and facilities teams.
From pre-functional checks to witnessed functional tests, establish that your systems operate as the design intends.
Verify your systemsMeasured airflow, hydronic balancing and recorded settings. Get the right flow to the right place.
Find the right balanceConnect BMS logic to real operation, resolve performance gaps and keep systems working through the seasons.
Take control of performanceAlso supporting seasonal commissioning, retro-commissioning and commissioning management. See all services
Built around your building
A balanced terminal is one part of the picture. How the plant, distribution and controls work together is what shapes the building’s day-to-day performance.
We bring the measurements, coordination and documentation together — so project teams can make informed decisions and operators can take over with confidence.
Get to know Clear AirA connected approach
A clear way forward
Clarify design intent, test requirements and the commissioning plan.
Review installation readiness and close out issues before testing.
Measure flows, verify controls and record functional performance.
Provide clear reports, final settings and operator information.
Review seasonal operation and tune performance after occupation.
Sectors we support
Project-specific commissioning scopes, from occupied workplaces to technically demanding environments.
Project perspectives
Placeholder case study
An example of how a workplace commissioning case study can explain system readiness, balanced flows and handover.
Air & water
Placeholder case study
An illustrative case study structure for ventilation verification in a healthcare environment.
Ventilation
Placeholder case study
An example showing how controls verification and seasonal follow-up can be documented for an education project.
BMS & controlsExample case studies are placeholders, not completed Clear Air Solutions projects. Stock photography is illustrative. Replace examples with approved project information before publishing.
Evidence that supports your project
Testing and balancing records to support the ventilation requirements set out in the project’s NZ Building Code compliance pathway.
Controls verification and tuning to help systems follow the design intent and support the project’s energy efficiency objectives.
Structured commissioning evidence for consent documentation, with Green Star and NABERSNZ support where included in the agreed scope.
Commissioning supports the project’s evidence. Code compliance decisions, certifications and ratings remain with the relevant authorities and authorised assessors.
Trust, backed by evidence
Only verified memberships, certifications and approved client marks belong here.
Testimonial placeholder — replace before launch
“[Add a real client’s approved feedback about their commissioning experience.]”[Client name, role and project — with written approval]
Field notes
A practical look at design reviews, test readiness and the value of resolving issues early.
How clear test records can support a project’s G4 ventilation and consent documentation.
Start building tuning with operating hours, setpoints and the trends already in your BMS.
Let's get it working properly